Home / Services / ADUs and additions

ADUs and home additions in San Diego

We design, permit and build junior ADUs, garage conversions, detached ADUs and room additions across San Diego County. Every project starts with a feasibility review, so you know what your lot allows before you pay for drawings.

Junior ADU from $50,000 · Garage conversion from $80,000 · Detached ADU from $260,000 · Additions from $250 per sq ft

Design concept of a single-story detached ADU with white stucco, wood siding, a covered entry porch and a glass slider, in a drought-tolerant San Diego backyard
Design concept, detached ADU

ADUs and additions at a glance

Starting priceJunior ADU from $50,000. Garage conversion from $80,000. Attached ADU from $170,000. Detached ADU from $260,000.
Room additionsFrom $250 per square foot
Construction timeDepends on the size and the site; a written schedule once the plans are approved
PermitsAlways required. We prepare the plans and handle the city or county review.
First stepA feasibility review of setbacks, utilities, access and slope before you pay for design
Warranty1 year on workmanship, in writing in your contract. Manufacturers' warranties pass on to you
WhereSan Diego County, including the City of San Diego, Poway, Escondido, San Marcos, Carlsbad and Encinitas
  • “Seven does great work and stands behind their workmanship!”

    M. V. · Kitchen, then a primary bathroom, Escondido
    Nextdoor, June 2026

  • “The dedication to timelines was impressive, and the project was completed within the agreed-upon timeframe.”

    Ryoko C. · Kitchen remodel
    BBB, January 2024

  • “Once the project started, the crew was professional, courteous and responsible.”

    J. R. · Primary bathroom, Encinitas
    Nextdoor, June 2026

ADU or addition?

A room addition makes your house bigger: a bedroom, a primary suite, a larger kitchen and family room, or a second story. It shares your walls, your utilities and your front door.

An ADU is a separate home on the same lot, with its own entrance, kitchen and bathroom. Families use them for a parent, a grown child or long-term rental income.

A junior ADU is a smaller unit, up to 500 square feet, created inside the existing house or an attached garage. It’s usually the lowest-cost way to add a legal second unit. Read our junior ADU guide.

If you need more room for your own household, that’s an addition. If you need a second household on the property, that’s an ADU. When it could go either way, we price both.

How long it takes

Room additions: 3 to 5 months of construction.

ADUs: Construction time depends on the size of the ADU and the site. Design, engineering and city review come first, and we don’t promise a date for that part because the city’s review time is out of anyone’s control. Once the plans are approved, you get a written construction schedule. When you compare builders, check whether their schedule counts permits or only construction.

What ADUs and additions cost

Our 2026 starting prices. Your lot has a lot to do with where you land, which is why we start with feasibility. Your price goes in your written contract and changes only through a written change order that you and we both sign.

JADU (up to 500 sq ft, inside the home)

A junior ADU carved out of existing space, with its own entrance and an efficiency kitchen.

from $50,000

Garage conversion ADU

Turning an attached or detached garage into a legal living unit.

from $80,000

Attached ADU

A new unit built onto the existing house.

from $170,000

Detached ADU

A standalone backyard home, from foundation to finish.

from $260,000

Every project is scoped and quoted individually. City permits and fees are billed separately.

See every starting price in the cost guide

Additions and new homes

Room additions

Bedrooms, primary suites, family rooms and second-story additions.

from $250 per sq ft

New construction

Ground-up homes on your lot.

from $300 per sq ft

Every project is scoped and quoted individually. City permits and fees are billed separately.

ADU floor plans

Four sample layouts, from a studio to three bedrooms. Every ADU is drawn for its lot, so sizes and room order can change. Pick a plan to see its budget range.

  • Pre-approved plans. The County of San Diego publishes ADU plan sets at no cost, and the City of San Diego accepts them with a 30-day review. The sets come about 85% done: we finish the parts for your lot (site plan, energy and truss calculations) and build it. Or we draw a plan for your lot.
  • 750 sq ft or less. State law bars impact fees on an ADU this size. Under 500 sq ft, school fees go away too. Permit fees still apply.
3D design concept of the studio: bath and closet at the back, kitchen wall with a table for two, bed corner and sofa by the front door
3D design concept
BathKitchenLivingFRONT DOOR20 ft x 20 ft
Sample floor plan

Studio

400 sq ft · 1 bath · 20 ft x 20 ft

Sized for a garage conversion, a junior ADU or a small backyard cottage: a full bath and closet at the back, a kitchen wall with room for a table, and open living and sleeping. At 400 sq ft it is under both fee limits.

See the budget range
3D design concept of the one-bedroom: kitchen with island at the back, dining in the middle, living room by the front door, bedroom, bath and laundry on the left
3D design concept
BathBedroom11' x 14'KitchenDiningLivingFRONT DOOR24 ft x 25 ft
Sample floor plan

One bedroom

600 sq ft · 1 bath · 24 ft x 25 ft

The front door opens into the living room, with the kitchen and island at the back. The bedroom, bath and laundry sit off a short hall. A common choice for a parent or a long-term tenant. At 600 sq ft there are no impact fees.

See the budget range
3D design concept of the two-bedroom: open kitchen, dining and living in the middle, second bedroom and hall bath on the left, primary suite with bath and walk-in closet on the right
3D design concept
BathBedroom11' x 14'KitchenDiningLivingPrimarybedroomBathFRONT DOOR36 ft x 25 ft
Sample floor plan

Two bedrooms

900 sq ft · 2 baths · 36 ft x 25 ft

A primary suite with its own bath and walk-in closet on one side, a second bedroom and hall bath on the other, and an open kitchen, dining and living room in the middle.

See the budget range
3D design concept of the three-bedroom: two bedrooms and a hall bath on the left, open kitchen, dining and living in the middle, primary suite on the right
3D design concept
Bedroom12' x 11'BathBedroom12' x 11'KitchenDiningLivingPrimarybedroomBathFRONT DOOR40 ft x 29 ft
Sample floor plan

Three bedrooms

1,160 sq ft · 2 baths · 40 ft x 29 ft

A primary suite with its own bath and walk-in closet, two more bedrooms off a short hall with a full bath, a laundry room and a large open kitchen, dining and living room.

See the budget range

Why two ADUs the same size can cost very different amounts

Converting or building new

A garage conversion starts with a slab, walls and a roof you already own. A detached unit needs all three.

Utilities

How far the unit sits from water, sewer and power, and whether your electrical panel can carry a second home. A long trench through a finished yard adds up.

Access, slope and foundation

A flat lot with a wide side yard is simple. A slope, or a spot machinery can’t reach, changes the foundation and the labor.

What the feasibility review covers

Your lotSetbacks, slope and the buildings already on it
How you’ll use itMore room for your own household points to an addition. A second household, such as a parent, a grown child or a long-term tenant, points to an ADU.
AccessSide-yard width, and whether machinery can reach the spot
UtilitiesWater, sewer and power connections, and what your electrical panel can carry
Which rules applyPlans go to the City of San Diego, the County or your own city, depending on where you live. State law sets the basics and local rules add detail, so we confirm what applies to your property.

You find out what your lot will cost to build on before you commit to design.

The design for a detached ADU we’re building in Del Mar

This two-bedroom backyard ADU has its own kitchen and one and a half bathrooms. Our 3D designer drew the kitchen and bathroom, so the owners could see the finished rooms before construction started. The exterior image is different: it is an exterior design concept of a modern finish (Hardie architectural panels, black trim, white stucco), not this ADU’s approved plans.

The ADU is in its final stage now. We’ll add photos of the finished unit when it’s done. See the Del Mar ADU project

Finished rooms we’ve added: Four Seasons sunrooms in Mira Mesa, Vista and Fallbrook.

Design concept of the finished Del Mar ADU: charcoal Hardie architectural panels on the outer walls, black trim and window frames, white stucco porch columns and a white stucco entry wall, a black front door, concrete pavers and agaves
Exterior design concept
3D design of the ADU kitchen: gas range under a stainless hood, wood slat backsplash and a French-door refrigerator
3D design, kitchen
3D design of the ADU bathroom: walk-in shower with a glass panel and wall niche, wood vanity and a round-corner mirror
3D design, bathroom

From feasibility to move-in

  1. Consultation

    We visit and talk through what the new space needs to do.

  2. Feasibility

    Setbacks, utilities, access and slope, checked before anyone pays for drawings.

  3. Design and engineering

    Architectural plans, structural engineering and 3D renderings.

  4. Permits

    We submit the plans and answer plan-check comments until they’re approved.

  5. Construction

    Foundation, framing, utilities, inspections and finishes.

  6. Final inspection

    We see it through sign-off and walk the finished unit with you.

ADU and addition questions

How much does an ADU cost in San Diego?

Our junior ADUs start at $50,000, garage conversions at $80,000, attached ADUs at $170,000 and detached ADUs at $260,000. Utilities, access, slope and foundation work are the biggest variables. Permit and plan-check fees are billed separately.

How long does it take to build an ADU?

Construction time depends on the size of the ADU and the site. Design, engineering and city review come first, and we don’t promise a date for that part because the city’s review time is out of anyone’s control. Once the plans are approved, you get a written construction schedule.

How big can my ADU be?

It depends on your lot, setbacks, existing structures and the rules where you live. We work it out in the feasibility review, before you commit to a design.

Is a garage conversion cheaper than a detached ADU?

Usually. The slab, walls and roof are already there. A detached unit gives you more freedom over layout and privacy. We can price both during feasibility.

Do you build ADUs in Carlsbad?

Yes. Carlsbad is its own city, so the plans go to the City of Carlsbad’s building department rather than San Diego’s. Parts of Carlsbad are in the coastal zone, where an ADU can also need a coastal development permit. Which rules apply to your lot is part of our feasibility review.

What are the ADU requirements in La Jolla?

La Jolla is part of the City of San Diego, so the city’s ADU rules apply. Much of La Jolla is in the Coastal Overlay Zone, where an ADU can need a coastal development permit, and some lots carry more coastal overlays on top of that. An in-law suite there is usually built as a junior ADU inside the house or as a detached ADU. We check what applies to your lot in the feasibility review, before any drawings.

Will an ADU raise my property taxes?

In California, generally only the value of the new construction is added to your assessment. Your existing home isn’t reassessed from scratch. Check the details with a tax professional.

Can I rent out my ADU?

Long-term rental is the most common reason our clients build one. Short-term rentals are regulated separately in San Diego, and we’ll point you to the rules that apply to your property.

What warranty do you offer?

Every project comes with our written warranty: 1 year on our workmanship, starting when the work is substantially complete. If a defect in our work shows up in that year, let us know in writing and we’ll fix it at no charge. Materials, fixtures and appliances carry their manufacturers' warranties, which we pass on to you. The full terms, including what isn’t covered, are in your contract. You can read the current wording on our client care and warranty page.

Do you build new homes from the ground up?

Yes, starting at $300 per square foot. Construction usually takes about 8 to 12 months for a one-story home. Design and city review come first, and we give you a written construction schedule once the plans are approved. How we build a new home

Our ADU projects by area

Each one has its own page with photos and what we did. All the areas we serve

Del Mar

See your ADU budget range

Send us a few details about the project and we’ll set up a visit to look at the space.

What would you like to build? (required, choose at least one)

Fields marked with an asterisk are required.

Or call us at (619) 880-2777.

Call Book a free consultation